CURRENT RUNNING PROJECTS | |||||
| S.NO | NAME OF CLIENT | Owening Authority | DETAILS OF JOB | AMOUNT | LOCATION |
| 1 | APCO INFRATECH PRIVATE LIMIETD | JPDCL | LT CROSSING AT KATRA(550+900 TO 564+400) ON THE PROJECT HIGHWAY FOR THE ABOVE PROJECT : CONSTRUCTION OF FOUR/SIX – LANE ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE K.M 515.000 TO K.M 528.300 (KUNJWANI TO SIDHRA SECTION OF NH-44) AND K.M 550.900 TO K.M 566.520 (DOMEL TO KATRA SECTION OF NH-44) ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA IN THE UT OF J&K ( PHASE II PACKAGE-XVII) | 4.00 CR | KATRA |
| 2 | APCO INFRATECH PRIVATE LIMIETD | DHBVN | CONSTRUCTION AND ERECTION OF 11KV HT/LT LINE AND SHIFTING OF TRANSFORMER FROM CH. 1TO 780 TO 9+700 OF DHBVN FOR DND-JEWAR INTERNATIONAL AIRPORT CONNECTING EXPRESSWAY PROJECT. | 2.45 CR | FARIDABAD |
| 3 | BHARTIA INFRA PROJECTS LTD. | APDCL | IMPROVEMENT & UPGRADATION OF ROAD FROM KUTHURI-DIJJU VALLEY ( KUTHURI-ANJOKPANI-DOKMOKA) UNDER ASOM MALA 2.0 FOR THE YEAR 2023-24. | 1.68 CR | KAJIRANGA |
| 4 | MKC INFRASTRUCTURE LTD. | APDCL | HT/LT ELECTRICAL UTILITY SHIFTING & CROSSING WORK UP TO 33KV FOR THE PROJECT OF ” FOUR LANING OF BADARPUR – CHURAIBARI SECTION OF NH-8 FROM DESIGN CHAINAGE-87.700 (CHANDKHIRA) TO KM. 106.500 CHURAIBARI IN THE STATE OF ASSAM ON HAM MODE (PACKAGE – VI)” | 10.65 CR | SILCHAR ASSAM |
| 5 | APCO INFRATECH PRIVATE LIMITED | JPDCL | LT & HT LINE INCLUDING DTR, SUBSTATION, & UNDER GROUND CROSSING CONSTRUCTION OF FOUR/SIX – LANE ACCESS CONTROL EXPRESSWAY FROM DESIGN CHAINAGE K.M 515.000 TO K.M 528.300 (KUNJWANI TO SIDHRA SECTION OF NH-44) AND K.M 550.900 TO K.M 566.520 (DOMEL TO KATRA SECTION OF NH-44) ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA IN THE UT OF J&K ( PHASE II PACKAGE-XVII) | 7.79 CR | JAMMU |
| 6 | SKYLARK INFRA ENGINEERING PVT. LTD. | MSEDCL | PROJECT FOR WORK OF ELECTRICAL UTILITY SHIFTING WORK AT HIWARKHED TO AKOT RAILWAY PROJECT. | 14.43 CR | AKOLA |